Completed
Location:
Clermont, Kentucky
Industry:
Commercial/Distillery
Jim Beam Welcome Center • HVAC and Plumbing Installation
Multiple visitor-facing buildings at one of bourbon’s most famous addresses — where the mechanical systems had one aesthetic requirement: invisibility.
Scope: HVAC and plumbing across visitor center, exhibit areas, and training facilities; integration with existing structures.
The Challenge: Tight architectural spaces, systems hidden from public view, coordination with exhibit elements, and multiple buildings under construction at once.
The Solution: Layouts adapted to disappear into the architecture, field solutions as design issues surfaced, and performance delivered without ever being seen. High-end visitor experience, mechanically invisible.